5 days
30 days wrong it takes 28 days
Using the sine rules in trigonometry the height of the mountain works out as 3704 meters in height to the nearest whole number.
Ignoring air resistance, or bouncing off the sides of the shaft on the way down ...-- Speed when you let it go = 0-- Speed after 6 seconds = 6 G = 58.84 meters per second-- Average speed = 1/2 (0 + 58.84) = 29.42 meters per second-- In 6 seconds, at an average speed of 29.42 meters per second,it fell 176.5 meters.
kilometers
There are 1000 meters in a kilometer. That is what the prefix "kilo" means. 0.3 times 1000 meters is 300 meters. 300 meters minus 60 meters is 240 meters.
14.4
30 days The answer is 28 days. On the 27th day, the monkey has reached 27m. He then climbs 3m on the 28th day and reaches the top.
30 days wrong it takes 28 days
443/0.6 = 7381/3 seconds = 12 minutes 181/3 seconds
The box inside the backboard of a basketball goal has an area of 0.59 meters by 0.45 meters. The bottom of the box sits 0.15 meters above the bottom edge of the backboard.
The Shinbone is a mountain cliff in Sevier County in the state of Tennessee (TN). The Shinbone climbs to 974 feet (296.88 meters) above sea level.
It is 1,700 meters (5,577 feet) to the bottom of the Monterey bay. :):):):):):):):)
At least 3,500 joules, if his climbing effort is 100% efficient, but probably more than that.
Bottom currents move too slow.
Well, its simple. It says every hour it climbs up 3 metres then down 2. So each hour it climbs up 1 metre and, then you would easliy find the answer: -It takes 30 hours for the frog to reach the top!!! Enjoy!!!
1.5
The area of Southerham Machine Bottom Pit is 16,000.0 square meters.