There is not an exact number of days in a month and therefore weeks in a month. So the best way is to convert to years (52 weeks in year) and then multiply by 12 (months in a year)(123/52)*12 = 28.38461538461538 months.
150000000 x 50000 = 7500000000000
63340
Only 1 and 97.
multiplication algorithm What?? The answer is: their product.
52
(52,1)(26,2)(13,4)
66?
Tellurium-123 has 52 protons and 71 neutrons. This is determined by the atomic number and mass number of tellurium (52 protons and 123 total nucleons).
175 - 123 = 52
123
100
9,515
144
2,808
Its product.
1080