T = Ta/Td

Where

T = Takt time, e.g. [minutes of work / unit produced]

Ta = Net Time available to work, e.g. [minutes of work / day]

Td = Time demand (customer demand), e.g. [units required / day]

User Avatar

Wiki User

16y ago

What else can I help you with?

Related Questions

What is the takt time used for?

Takt time comes from the german word Taktzeit. Takzeit means cycle time. Takt time is used for industrial manufacturing lines. Takt time is put into a mathematical expression to express the cycle time.


What is the best definition of Takt time?

Takt Time is the pace at which your customers demand what you provide them


What does takt stand for?

Takt Time is the pace at which your customers demand what you provide them


What is the difference between takt time and cycle time?

cycle time is a time between two measuring points and TAKT time is a rate or frequent.


What is the difference between throughput and takt time?

Throughput refers to the amount of product or work completed in a given time period, indicating how efficiently a process operates. Takt time, on the other hand, is the available production time divided by customer demand, representing the maximum allowable time to produce one unit to meet demand. While throughput measures output, takt time sets the pace for production to ensure customer needs are met on time. Essentially, throughput focuses on actual performance, while takt time serves as a target for production efficiency.


What is takt time used in Lean manufacturing?

Time Available divided by customer demands


How did they find assembly line balancing?

1) First you need to construct a precedence chart of tasks. For example: A ----> B ----> C ----> D 2) Next, do time study to determine how much time required to perform each task. A (4 mins) ----> B (2 mins) ----> C (2 mins) ----> D (2 mins) 3) Find the takt time. Takt time = available production time per day/customer demand per day 4) Calculate the minimum number of workstations required, given the task times above. Below is the formula: Min # workstations = Total time for tasks divided by takt time Hope it helps!


Manufacturing cycle time?

Mechanical engineers aren't the best source for answering manufacturing questions. Takt time is a function of total available time for production and production demand. Example: If you have 100 minutes available for production per day and your need is to produce 100 pieces per day, your takt time would be 1 minute. If you need 200 pieces per day, then your takt time would be .5 minutes. In other words, you need to produce a part every 30 seconds to make the plan.


If the formula to calculate work is distance divided by time how do you apply the formula?

You would have a very tough time, because that isn't the formula to calculate work. (distance) divided by (time) is the formula to calculate speed. The formula to calculate work is: (force) multiplied by (distance).


What is formula of power?

the formula for power is work/time.


What formula relates work and power?

The formula that relates work and power is: Power = Work / Time. Power is the rate at which work is done, which is the amount of work done divided by the time it takes to do that work.


What is the formula for measuring the rate of work?

The formula for measuring the rate of work is: Work = Force × Distance ÷ Time. This formula takes into account the force applied, the distance over which the force is applied, and the time taken to complete the work.