T = Ta/Td
Where
T = Takt time, e.g. [minutes of work / unit produced]
Ta = Net Time available to work, e.g. [minutes of work / day]
Td = Time demand (customer demand), e.g. [units required / day]
Takt time comes from the german word Taktzeit. Takzeit means cycle time. Takt time is used for industrial manufacturing lines. Takt time is put into a mathematical expression to express the cycle time.
Work Output=Resistance X Distance
== I'm pretty sure the formula for distance is: D== rt (Distance= rate x time) == The formula for distance is: speed x time.
Work (joules) = force (newtons) * distance (metres)
Speed equals distance divided by time. By rearranging that formula, we get time equals distance divided by speed.
Takt time comes from the german word Taktzeit. Takzeit means cycle time. Takt time is used for industrial manufacturing lines. Takt time is put into a mathematical expression to express the cycle time.
Takt Time is the pace at which your customers demand what you provide them
Takt Time is the pace at which your customers demand what you provide them
cycle time is a time between two measuring points and TAKT time is a rate or frequent.
Time Available divided by customer demands
1) First you need to construct a precedence chart of tasks. For example: A ----> B ----> C ----> D 2) Next, do time study to determine how much time required to perform each task. A (4 mins) ----> B (2 mins) ----> C (2 mins) ----> D (2 mins) 3) Find the takt time. Takt time = available production time per day/customer demand per day 4) Calculate the minimum number of workstations required, given the task times above. Below is the formula: Min # workstations = Total time for tasks divided by takt time Hope it helps!
the formula for power is work/time.
You would have a very tough time, because that isn't the formula to calculate work. (distance) divided by (time) is the formula to calculate speed. The formula to calculate work is: (force) multiplied by (distance).
Mechanical engineers aren't the best source for answering manufacturing questions. Takt time is a function of total available time for production and production demand. Example: If you have 100 minutes available for production per day and your need is to produce 100 pieces per day, your takt time would be 1 minute. If you need 200 pieces per day, then your takt time would be .5 minutes. In other words, you need to produce a part every 30 seconds to make the plan.
power = work/time
You divide work by time.
Work = power x time