answersLogoWhite

0


Best Answer

A line must pass the vertical line test to be considered a function. This means that a vertical line drawn through any point on the line will only intersect the line at one point, indicating that each input has only one output.

User Avatar

AnswerBot

1d ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What criteria must be met for a line to be considered a function?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What criteria must be met in order for a function to be considered linear?

A function is considered linear if it follows the rule of proportionality, meaning that the relationship between the input and output values is constant and can be represented by a straight line on a graph.


What criteria must be met for a relationship to be considered a function?

For a relationship to be considered a function, each input value must correspond to exactly one output value. This means that each input cannot have multiple outputs.


What is the criteria line?

The criteria line refers to a set of standards or requirements that must be met in order for something to be considered acceptable or satisfactory. It is commonly used in evaluations, assessments, or decision-making processes to establish the parameters for success or judgement.


What major criteria must product or process meet in order to be considered emerging technology?

The major criteria must a product or process meet in order to be considered emerging technology is its pureness and usefulness.


What major criteria must a product or process meet in order to be considered emerging technology?

The major criteria must a product or process meet in order to be considered emerging technology is its pureness and usefulness.


What is performance criteria?

Performance criteria is a guideline used to grade a performance. It is a description of things that must be considered to determine the grade.


What does functional criteria mean in design?

Explaining what your design must do to be considered successful.


What is the difference between the definition of done and acceptance criteria in a project?

The definition of done outlines the criteria that must be met for a task or project to be considered complete, while acceptance criteria specify the conditions that must be satisfied for a deliverable to be accepted by the stakeholders.


What is the criteria for effective accounting system?

In order for an accounting system to be considered effective it must meet 3 criteria. It must provide accurate information, have useful information, and be presented in a timely manner.


What is a function that forms a line graphed?

Any function of the form f(x) = ax + b, or any relation of the form Ax + By = C.This is the function that forms a line graphed. The slope of line can be taken out as C/A. * * * * * The above answer assumes that a line MUST be a straight line! Since the graph is a line, the domain must be an interval in the Real numbers. The interval may be finite, or infinite in one or both directions. In order that the graph does not have breaks in it the function must be continuous. Any such function will do.


What are the 3 criteria?

The three criteria refer to the selection criteria, which are the qualifications and requirements an individual must meet in order to be considered for a specific position or opportunity. These criteria help in evaluating candidates and determining their suitability for the role or task at hand.


What criteria must be met for a hand to be considered a flush in poker?

In poker, a hand is considered a flush if all five cards are of the same suit.