55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards
55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards
55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards
55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards
2.3 cubic yards is 107,308.8 cubic inches.
.8888 cubic yards
Multiply (acre-feet) by (1,613 and 1/3) to get (cubic yards). 3 acre-feet = 4,840 cubic yards. Multiply (cubic yards) by (0.00062) to get (acre-feet). 24,200 cubic yards = 15 acre-feet
6 inches = 1/6 yards. So 70 sq yards * 6 inches = 70*1/6 cubic yards = 11.66... cubic yards.
A yard is 91.44 cm One cubic yard is 91.44x91.44x91.44=764554.857984 cubic cm, or .765 cubic meters. Concrete and sand are often measured in cubic yards. In metric countries it is measured in cubic meters. Roughly there are 1.3 cubic yards in a cubic meter.
55' x 12' x 18' = 11,880 cubic feet = 440 cubic yards
220 cubic yards how did you come with that answer cause on my multiple choice they give me 18.333, 3960, 440, and 1296 ---------------------------- 220 is incorrect. The CORRECT answer is 440. (55*12*18)/3^3 = 11880/27 = 440 Where 27 is the number of cubic ft. in a cubic yard. 3ft. cubed (3^3), or (3*3*3) = 27.
Capacity = 55 ft * 12 ft * 18 ft = 55/3 * 12/3 * 18/3 cubic yards = 55*4*2 = 440 cubic yards.
length
There are approximately 1.30795 cubic yards in a cubic meter.
It is not possible to calculate the capacity in cubic yards when only two of the three relevant measures (length, width and height) are given. Assuming the two given numbers are the length and width, the capacity depends on the stack - which could be microscopically thin, or several miles high!
52 cubic yards = 1,404 cubic feet.
1 cubic foot = 0.037 cubic yards
0.619 cubic yards.
Divide cubic feet by 27 to get cubic yards.
240 cubic feet = about 8.9 cubic yards. (8.88888889 cubic yards).
Easy to do. Multiply cubic yards by 27 to get cubic feet.