In 1 mile there 1760 yards. Hence 4000 / 1760 = 2.272727... miles. That is approximately 2.27 miles or 2 miles 480 yards.
the receiver who first catches the ball gets credit for the catch and the number of yards he gains until he pitches the ball. The player whom the ball is pitched to gets credit of the yardage he gains from the moment he gains control of the pitched ball to the moment he gets tackled. He does not get credit for a reception though. All total yardage is counted as receiving yards and no rushing yards are gained by the either player. the QB gets credit for 1 completion and all total yardage gained by both players.
It is 2/13.
The answer depends on the units used for 16500. It should be obvious to anybody that 16500 metres and 16500 yards will round to two different answers, as will measurements in other units.
1890 rounded to the nerest 8=1900
53 and 1/3 cubic feet, concrete is normally sold buy the cubic yard, this would be 1.975 cubic yards. Figure on 2.25 CU yards to be safe. You do not want to run short when pouring concrete.
You will need a minimum of 2.42 cubic yards of cement.
At 4" thick you would need at least 7.04 cubic yards. At 6" thick you'll need at least 10.56 cubic yards. If the slab is 2" thick, you'll need 3.52cubic yards.
You will need 3.7 cubic yards of cement.
10.67 Cubic Yards
47.55 cubic yards . 4" would be 5.23 cubic yards.
You will need a minimum of 74.1 cubic yards.
If it is 4 inches deep/thick, 2 cubic yards. If it is 6 inches deep/thick, 3 cubic yards.
6.94 Cubic Yards
3.6 cubic yards will be enough.
5.93 cubic yards.
Apples and oranges. Without knowing how thick the 450 sq. ft. area is or how thick you want it to be you can't convert to cubic yards. A cubic yard has 27 cubic feet. One square foot 3 inches thick would be 1/4 cubic feet. 4 sq. ft. 3 inches thick would be 1 cubic foot. 450 sq. ft. 3 inches thick is 112 1/2 cubic feet or just a bit over 4 cubic yards. 450 sq. ft. 4 inches thick is 150 cubic feet or 5 1/2 cubic yards.