answersLogoWhite

0

probablity of union

probabilty of union is define as

P(AUB)=P(A)+P(B)-P(AnB) (for not mutualy exclusive data( where atleast one event

is common in two samples)

P(AUB)=P(A)+P(B) (mutualy exculsive)

probablity of intersect

P(AnB)=P(A).P(B)

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

What is the intersection of the assessed probability and the severity of a hazard called in the CRM process?

The intersection of the assessed probability and severity of a hazard is the Risk Level.


What is the intersection of the assessed probability and severity of a hazard called in the CRM process?

The intersection of the assessed probability and severity of a hazard is the Risk Level.


What is the union intersection set?

Given two or more sets there is a set which is their union and a set which is there intersection. But, there is no such thing as a "union intersection set", as required for the answer to the question.


What is the intersection of the assessed probability and severity of a hazard?

It is the risk.


What is intersection of the assessed probability and severity of a hazard?

It is the risk.


What is the intersection of the assessed probability and severity of the hazzard called in the Composite Risk Management?

Assessment is the intersection of the assessed probability and severity of the hazard called in the Composite Risk Management.


What is a antonym for intersection?

Union


Is there any case when union and intersection are same in sets?

if we have set A and B consider A={1,2,3,4}and B={3,4,5,6} the union of these sets is A and B={1,2,3,4,5,6}and the intersection is{3,4} the union and the intersection are same only if A=B


Why is the probability of the intersection of two events subtracted in the sum of the probability of two events?

rghrugfy


What is the intersection of the assessed probability and severity hazard in the crm process?

It is the risk.


What is the intersection of the assessed probability and severity of hazards in the crm process?

The risk.


What is the intersection of the assesed probability and severity of hazard called in the CRM?

The risk.

Trending Questions
What is MDS in statistics? In a unimodal symmetrical distribution the mean is equal to? If you wear a US women's size 26 jean what is the waist size in inches? Why is the standard normal probability distribution unique? What is the definition of quanitative data? Role of high-level data model in the database design process? When we draw a card from a deck the outcome is uncertain The card's value is? What happens if you estimate population standard deviation with the sample standard deviation? How many M and Ms are sold each day in the US? What is Data Warehousing and Data Mining? For interval ratio data the correct measure of central tendency is? Which SQL keyword is used to specify a condition that rows must meet to be included in the results of an SQL SELECT query? What is the probability of a number less than 6 on the number cube followed by a number equal to 6 on the spinner? Most common 3 digit numbers in pa lottery? Find the probability that the month of February in a year 2008 may have 5 Tuesdays? Box A has 3 red marbles and 2 yellow marble Box B has 2 red marble and 1 yellow If you have to pick a red marble to win and can't look in the box which box would give you the best chance? What effect increasing only the population standard deviation will have on the width of the confidence interval? Can you figure out the probability of each of the occurrences without drawing the tree diagram? What is the difference between a variable and a control? What type of data is easily shown on a bar graph?