To calculate the amount of ballast and cement needed for a footing measuring 10m x 1m deep, you first determine the volume of the footing, which is 10 cubic meters (10m x 1m x 1m). A typical concrete mix ratio is 1 part cement, 2 parts sand, and 4 parts ballast. For a standard mix, you would need approximately 1.5 cubic meters of cement, 3 cubic meters of sand, and 6 cubic meters of ballast, but this can vary based on the specific mix design and strength requirements. Always consult with a structural engineer for precise calculations tailored to your project.
It depends on how deep it is. If it is 6 inches deep, you will need 77 yards.
you will need about 4 cuyds for your project.
131,328 in3, but you should have worked it out for yourself.
To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.
in texas is about 5 dollars per cubic foot plus labor last time i did it it was it was 600 dollar for a 30 feet long 12in width and 12in deep footing.
The amount of cement to add to one ton of ballast depends on the desired concrete mix ratio. A common mix ratio for general-purpose concrete is 1 part cement to 4 parts ballast, which would mean adding approximately 0.25 tons (or 250 kg) of cement to one ton of ballast. However, specific project requirements may necessitate adjustments to this ratio. Always consult relevant guidelines or specifications for the exact mix needed.
The typical mix ratio for concrete is often around 1 part cement to 6 parts ballast (aggregate), by volume. This means that for 1 ton of ballast, you would generally use about 0.17 tons (or approximately 170 kg) of cement. However, the exact amount can vary based on the desired strength and application of the concrete mix. Always consult specific mix design guidelines for your project.
I am building a curb that will be 26 feet long, 6.5 inches wide and 4 inches deep. How much cement do I need?
At 4" deep, 89 sq. ft.
To prepare 16m³ of concrete, a common mix ratio is 1:2:3 (cement: sand: gravel). For this ratio, you'll need approximately 480 kg of cement, 960 kg of sand, and 1,440 kg of gravel. If you're using a standard 25 kg bag of cement, this would be about 19 bags. Additionally, the amount of ballast will depend on the specific mix design, but it typically involves using a combination of the sand and gravel.
It depends on how deep it is. If it is 6 inches deep, you will need 77 yards.
The answer will depend on how deep the cement needs to be.
you will need about 4 cuyds for your project.
131,328 in3, but you should have worked it out for yourself.
800 C feet
You'll need 3.53 cubic yards of cement.
To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.