answersLogoWhite

0

To calculate the amount of ballast and cement needed for a footing measuring 10m x 1m deep, you first determine the volume of the footing, which is 10 cubic meters (10m x 1m x 1m). A typical concrete mix ratio is 1 part cement, 2 parts sand, and 4 parts ballast. For a standard mix, you would need approximately 1.5 cubic meters of cement, 3 cubic meters of sand, and 6 cubic meters of ballast, but this can vary based on the specific mix design and strength requirements. Always consult with a structural engineer for precise calculations tailored to your project.

User Avatar

AnswerBot

1w ago

What else can I help you with?

Related Questions

How much cement do you order?

I am building a curb that will be 26 feet long, 6.5 inches wide and 4 inches deep. How much cement do I need?


How much does 1 yard cement cover?

At 4" deep, 89 sq. ft.


How much cement is needed for a 1040 square foot slab?

It depends on how deep it is. If it is 6 inches deep, you will need 77 yards.


How much sand and mortar needed for 100 square feet?

The answer will depend on how deep the cement needs to be.


How much concrete does it take for a footing 100 ft long 2 ft wide 5 inches deep?

you will need about 4 cuyds for your project.


Hom much concrete do you need for a footing 24ft long 2 ft wide 19 inches deep?

131,328 in3, but you should have worked it out for yourself.


How much concrete will it take to cement a 40 foot by 40 ft 6 inches deep?

800 C feet


How much concrete do you need to do 22ft long by 13ft wide and 4inches deep?

You'll need 3.53 cubic yards of cement.


How much does a David Brown 880 diesel tractor weigh?

Static weight with opperator -Rear 5430 lb with ballast 2950 lbs without ballast --------------------------------------Front 1810 lb with ballast 1540 lbs without ballast --------------------------------------Total 7240 lb with ballast 4470 lbs without ballast ----


How much ballast required for 2 cubic metres of concrete?

To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.


Why does your electronic ballast hum?

Electronic ballast does not hum as much as a choke. Minute hum of electronic ballast is the small inductor and capacitor producing an oscillation for high voltage generation,


How much does it cost to install cement?

It cost as much as it costs to install cement. Ken It cost as much as it costs to install cement. Ken