To calculate the amount of ballast and cement needed for a footing measuring 10m x 1m deep, you first determine the volume of the footing, which is 10 cubic meters (10m x 1m x 1m). A typical concrete mix ratio is 1 part cement, 2 parts sand, and 4 parts ballast. For a standard mix, you would need approximately 1.5 cubic meters of cement, 3 cubic meters of sand, and 6 cubic meters of ballast, but this can vary based on the specific mix design and strength requirements. Always consult with a structural engineer for precise calculations tailored to your project.
It depends on how deep it is. If it is 6 inches deep, you will need 77 yards.
you will need about 4 cuyds for your project.
131,328 in3, but you should have worked it out for yourself.
To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.
in texas is about 5 dollars per cubic foot plus labor last time i did it it was it was 600 dollar for a 30 feet long 12in width and 12in deep footing.
I am building a curb that will be 26 feet long, 6.5 inches wide and 4 inches deep. How much cement do I need?
At 4" deep, 89 sq. ft.
It depends on how deep it is. If it is 6 inches deep, you will need 77 yards.
The answer will depend on how deep the cement needs to be.
you will need about 4 cuyds for your project.
131,328 in3, but you should have worked it out for yourself.
800 C feet
You'll need 3.53 cubic yards of cement.
Static weight with opperator -Rear 5430 lb with ballast 2950 lbs without ballast --------------------------------------Front 1810 lb with ballast 1540 lbs without ballast --------------------------------------Total 7240 lb with ballast 4470 lbs without ballast ----
To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.
Electronic ballast does not hum as much as a choke. Minute hum of electronic ballast is the small inductor and capacitor producing an oscillation for high voltage generation,
It cost as much as it costs to install cement. Ken It cost as much as it costs to install cement. Ken