To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.
12L
26.69 cubic metres.26.69 cubic metres.26.69 cubic metres.26.69 cubic metres.
A cubic measure ment is required
0.2
To make 1 cubic meter of concrete, you typically need about 350 kg of cement and 700 kg of ballast (aggregates). Given that each bag of cement weighs 25 kg, you would need 14 bags of cement. For ballast, with each bag also weighing 25 kg, you would require approximately 28 bags of ballast.
1.75 tonnes 1,750 kg of ballast is one cubic metre, if its concrete then you'd need to add 300kg of cement to mix this to the right ratio for a foundation.
2.7 t
It is 0.65 cubic metres, approx.
In grade 25 concrete, which typically has a mix ratio of 1:1:2 (cement:sand:aggregate), approximately 0.5 cubic metres of sand is required per cubic metre of concrete. Since the density of sand is about 1,600 kg per cubic metre, this translates to around 800 kg of sand needed for one cubic metre of grade 25 concrete. This amount can vary slightly based on the specific mix design and moisture content of the sand.
To make concrete, the typical mix ratio commonly used is 1 part cement to 6 parts ballast (by volume). This means for every 1 tonne of ballast, you would need approximately 166.67 kg of cement, since 1 tonne of ballast is about 1 cubic meter, and a standard concrete mix requires 1 bag (usually 25 kg) of cement for every 0.15 cubic meters of concrete. Therefore, you would need around 6 to 7 bags of cement for 1 tonne of ballast, depending on the specific mix design.
12L
No. A cubic metre is a volume measurement, what you can fit in a box, 1x1x1 metres in dimension. A square metre is an area measurement corresponding to 1x1 metre.
26.69 cubic metres.26.69 cubic metres.26.69 cubic metres.26.69 cubic metres.
A box measuring 1 m × 1 m × 2 m would have a volume of 2 m3. The wikipedia article on cubic metres, http://en.wikipedia.org/wiki/Cubic_metre, has an a image of 1 cubic metre of concrete - 2 of those, side by side, would equal 2 cubic metres.
The answer is in the question: 250 cubic metres!The answer is in the question: 250 cubic metres!The answer is in the question: 250 cubic metres!The answer is in the question: 250 cubic metres!
A cubic measure ment is required
For one cubic meter of concrete used in a slab, approximately 0.3 to 0.5 cubic meters of sand is typically required, depending on the specific mix design. A common concrete mix ratio for slabs is 1:2:4 (cement:sand:aggregate), which translates to about 0.4 cubic meters of sand for each cubic meter of concrete. However, the exact amount may vary based on the desired strength and workability of the concrete.