1 cubic yard = 27 cubic feet
2 cubic yards = 54 cubic feet
.
.
.
435 cubic yards = 11,745 cubic feet
49 ft * 12 ft * 12 in = 49 ft * 12 ft * 1 ft = 588 cubic feet=588/27 cubic yards = 21.77... cubic yards.49 ft * 12 ft * 12 in = 49 ft * 12 ft * 1 ft = 588 cubic feet=588/27 cubic yards = 21.77... cubic yards.49 ft * 12 ft * 12 in = 49 ft * 12 ft * 1 ft = 588 cubic feet=588/27 cubic yards = 21.77... cubic yards.49 ft * 12 ft * 12 in = 49 ft * 12 ft * 1 ft = 588 cubic feet=588/27 cubic yards = 21.77... cubic yards.
1
8.5 ft * 16 ft * 4.5 ft = 612 cubic ft = 612/(3*3*3) cubic yards = 22.666... cu yards
324 ft³
27 cubic feet = 1 cubic yardVolume = 8-ft x 8-ft x 3-ft = 192 cubic feet = 71/9 cubic yards
The volume of the hole is (782 x 1.5) = 1,173 cubic ft. 1 cubic yard = 27 cubic ft 1,173 cubic ft = (1,173 / 27) = 43.444 cubic yards (repeating)
100 cubic metres convert to cubic yards
(3,600 square ft) x (1 ft) = 3,600 cubic ft.1 cubic yard = 27 cubic ft3,600 cubic ft = 3,600/27 = (133 and 1/3) cubic yards
It is 1.185185... cubic yards.
1,000 cubic feet is 37.04 cubic yards.
You can't convert cubic measure to square measure.
AnswerZero