1 cubic yard = 9 cubic feet.
4.5'*58'*12' = 3132 cubic feet
3132/9 = 348 cubic yards
40.529 (rounded)
14.62 cu yds
10 cubic yds per load
55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards55 ft * 12 ft * 18 ft = 55/3 yds * 4 yds * 6 yds = 440 cubic yards
31500 cu yds
No.
.3 cu. yds = 60.5922078 gallons
2 feet.
100 cubic foot bags.
Assuming you're using the builder's abbreviation of yard for cubic yard (eg a 6 yd skip holds 6 cubic yds): 1 yd = 3' ⇒ 24' x 30' x 1' = (24 ÷ 3 yds) x (30 ÷ 3 yds) x (1 ÷ 3 yds) = 262/3 cu yds ≈ 26.67 cu yds So you'll need enough sand for the above volume.
Google gives this answer : 3 (cubic yard) = 139 968 cubic inches
6 cubic yards is a volume equal to 1,211.8 US gallons.