This would surely depend on the size of the shovel.
3.141579265
if your numbers are in yards 8100 cu yd if they are in ft 300 cu yd
Mathematically, a yard is a measure of length, has only one dimension and thus has no volume which has three dimensions; so no matter how many of them you have you will never get a volume of 15 cu ft.If you are using "yard" in the slang, builders' way to represent cubic yards, then:1 yd = 3 ft1 cu yd = 1 yd x 1 yd x 1 yd= 3 ft x 3 ft x 3 ft= 27 cu ft⇒ 15 cu ft = 15 ÷ 27 cu yd= 5/9 cu yd≈ 0.56 cu yd
27 cu. ft. = 1 cu. yd.
46656 cu in = 1 cu yd
Assuming by "yard" you mean a "builder's" yard = 1 cubic yard: 1 yd = 3 ft 1 cu yd = 1 yd x 1 yd x 1 yd = 3 ft x 3 ft x 3 ft = 27 cu ft. 1ft x 200 ft x 200 ft = 40000 cu ft → 40000 cu ft = 40000 ÷ 27 cu yd = 1481 13/27 cu yd ≈ 1481.5 cu yd.
2.7 cu yd
3 ft = 1 yd 36 in = 1 yd ⇒ 50 ft x 7 ft x 4 in = (50 ÷ 3) yd x (7 ÷ 3) yd x (4 ÷ 36) yd = 350/81 cu yd = 426/81 cu yd ≈ 4.321 cu yd
.07 (No. That is incorrect.) Actually there are 27 cu ft in a cu yard or .037 cu yards in a cu ft.
27 cu. ft. = 1 cu. yd.
28,000 US gallons equates to 3,743.1 cubic feet.
The volume of the box is 36 * 24 * 18 = 15552 cubic inches. ---------------------------------------------- 1 ft = 1/3 yd → volume = 1 yd × 2 ft × 1.5 ft = 1 yd × (2 × 1/3) yd × (1.5 × 1/3) yd = 1/3 cu yd = 0.333... cu yd ≈ 0.33 cu yd 1 yd = 0.9144 m (exactly)* → 1 cu yd = 1 yd × 1 yd × 1 yd = 0.9144 m × 0.9144 m × 0.9144 m = (0.9144)³ cu m → 1/3 cu yd = 1/3 × (0.9144)³ cu m = 497757069/1953125000 cu m = 0.25485.... cu m ≈ 0.25 cu m * derivation of 1 yd = 0.9144m (exactly): 1 in = 2.54 cm = 0.0254 m (exactly) 1 yd = 36 in = 36 × 0.0254 m = 0.9144 m (exactly) If you are using an approximation for 1 inch in centimetres, then 1 yd ≈ 36 × approximation ÷ 100 metres. eg if 1 in ≈ 2.5 cm, then 1 yd ≈ 36 × 2.5 ÷ 100 m = 0.9 m and volume ≈ 1/3 × (9/10)³ cu m = 243/1000 cu m = 0.243 cu m