Volume required = pi*r2*h = pi*32*16 = 452.4 cubic feet
about 71 cubic metres of gravel i think
cylinder 18 feet diameter x 1.5 feet deep volume = 381 cubic feet
To calculate the volume of gravel needed to fill a hole measuring 26 feet by 15 feet and 2 feet deep, you can use the formula for volume: length × width × depth. Thus, the volume is 26 ft × 15 ft × 2 ft = 780 cubic feet. Therefore, you would need 780 cubic feet of gravel to fill the hole.
To calculate the volume of gravel needed, first convert the dimensions to feet: 36 inches is 3 feet deep, and 16 inches is approximately 1.33 feet wide. The volume can be calculated using the formula for volume: length × width × depth. Therefore, the volume is 5,500 feet × 1.33 feet × 3 feet, which equals approximately 21,915 cubic feet of gravel needed to fill the ditch.
885 gallons.
218.75 cubic feet or 8.1 cubic yards
18.6240 yd³
3467
a 4 feet diameter tank holds 94 gallons/foot. Therefore 94 x 3 =282 gallons
Approx 642665 US gallons.
To determine how much gravel is needed to fill an area of 10 by 5 feet, you first calculate the area by multiplying the length and width: 10 feet × 5 feet = 50 square feet. Next, decide on the desired depth of the gravel fill (for example, 3 inches or 0.25 feet). Multiply the area by the depth to find the volume in cubic feet: 50 square feet × 0.25 feet = 12.5 cubic feet of gravel required.
29.45 cubic feet or 183.45 US gallons.