375 Js (((((((((((: this is the right answer
Work done = increase in kinetic energy ie 1/2 * 10 * (3+2)(3-2) [recall a2 - b2 = (a+b)(a-b)] Hence work done = 25 joule.
30 J
Work done = Increase in kinetic energy SO W = (1/2) m (v22 - v12) So W = 12 x 5 x 3 = 180 J
When the bike is moving at 2 m/s, its kinetic energy is (1/2 m v2) = (5 x 4) = 20 joules.When it's moving at 3 m/s, its kinetic energy is (1/2 m v2) = (5 x 9) = 45 joules.The difference between initial KE and final KE is (45 - 20) = 25 joules.That's how much work you have to do on it in order to increase its KE.
220*.05 +220 boom. done. finished.
10kg
Work done = increase in kinetic energy ie 1/2 * 10 * (3+2)(3-2) [recall a2 - b2 = (a+b)(a-b)] Hence work done = 25 joule.
increase drive pulley size
ti can only be done by using hacking tools. there is no way to increase th speed of working in good game farmer.
1500 j
work=mass*speed,5*2=10
Tricks done on a bmx bicycle .
537.5 J
1,500 J
the speed at which work is done is velocity
3000j
312.5 J