The mixture depends on the concrete strength, flow properties and other specifications required, quality of cement, aggregates and other chemical additives that will be used.
Typically 1 cubic meter concrete should include about 310kg cement, 800kg sand, 900kg gravel and 220kg water.
Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg
A typical mixture of concrete will be 10 to 15% cement, 60 to 75% aggregate, and 15 to 20% water.
concrete 2400 Kg/m3aluminun 2712 Kg/m3
The amount of rebar in a cubic meter of concrete can vary depending on the design specifications of the concrete structure. Typically, rebar makes up around 1-2% of the total volume of concrete, so in a cubic meter of concrete, there may be around 20-40 kilograms of rebar.
The mass of a cubic metre of concrete is 2250-2400 kilograms.
One cubic meter is equivalent to 35.23 cubic feet, or one cubic meter is equivalent to 1.35 cubic yards.
7 cement bags per 1 cubic meter of concrete......
According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete
One cubic meter of concrete has 1,000 liters. Therefore, 0.1 cubic meters of concrete would be 100 liters. This can also be expressed as 100,000 cubic centimeters.
A cubic metre (or 'stere' as it is correctly known ) is 35.1 cubic feet. -In wet asphalt concrete that weighs about 5,250 pounds - just over 2 and a half tons !
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
I'm assuming by bricki you mean aggregate? There are several different mixes of concrete that yield different strengths. One of the more common mixes is a 3/2/1 mix this combines 3 parts aggregate (crushed stone), 2 parts sand and 1 part portland cement. with this mixture to make 1 cubic meter of concrete you will need almost 1/2 cubic meter of aggregate, 1/3 cubic meter sand and 1/6 cubic meter portland cement mixed with about 75 liters of water. Different mixes use varying amounts of stone though the sand and cement mixture stays between 1 1/2 : 1 to 2:1