A typical mixture of concrete will be 10 to 15% cement, 60 to 75% aggregate, and 15 to 20% water.

User Avatar

Wiki User

15y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How do you mix 1 cubic meter of concrete?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How many cement bags per 1 cubic meter of concrete?

7 cement bags per 1 cubic meter of concrete......


How do you work out 1 cubic meter of concrete?

One cubic meter is equivalent to 35.23 cubic feet, or one cubic meter is equivalent to 1.35 cubic yards.


What is the number of bags of cement required for 1 cubic meter of M25 grade cement?

For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.


How many pound in a cubic yard of concrete?

This may help or not. A cubic meter of concrete weighs 1(one) tonne Metric. If you convert 1 tonne to pounds and a cubic meter to cubic yards, then, you have it. 1cubic meter=1.30795037 cubic yards. 1tonne=0.98420625 of a ton..1ton=2240pounds. Mate, I hope that's right. If not it'll give you something to go on with.


How much percent steel for 1 cubic meter concrete?

1%


How many 35kg cement bags per 1 cubic meter of concrete?

According to Blue Circle it takes 108 bags of concrete to get a cubic meter


How many tons rebar in a cubic meter of concrete?

The amount of rebar in a cubic meter of concrete can vary depending on the design specifications of the concrete structure. Typically, rebar makes up around 1-2% of the total volume of concrete, so in a cubic meter of concrete, there may be around 20-40 kilograms of rebar.


How many cubic meter of bricki n a cubic meter concrete?

I'm assuming by bricki you mean aggregate? There are several different mixes of concrete that yield different strengths. One of the more common mixes is a 3/2/1 mix this combines 3 parts aggregate (crushed stone), 2 parts sand and 1 part portland cement. with this mixture to make 1 cubic meter of concrete you will need almost 1/2 cubic meter of aggregate, 1/3 cubic meter sand and 1/6 cubic meter portland cement mixed with about 75 liters of water. Different mixes use varying amounts of stone though the sand and cement mixture stays between 1 1/2 : 1 to 2:1


How many wheelbarrows in 1 cubic meter of concrete?

According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete


How much Cement content in 1 cubic meter concrete?

300kg


Cost of 1 cubic meter of M30 concrete in India?

2900


What is weight of aggregate in 1 cubic meter of concrete?

One ton