It takes 100 man-days, so three men would take 33 and a third days and 8 men 12½ days. Working together the 3 men and 8 men would take 100/11 or 9 and a ninth days
Well, buckle up, buttercup. If 25 men can build a house in 18 days, that means it takes 25*18 = 450 man-days to build the house. Now, if you throw 15 men into the mix, you just need to divide those 450 man-days by 15 to find out how many days it will take them. So, 450 man-days divided by 15 men equals 30 days for those fellas to build that house.
Building 5 houses takes 12 x 75 ie 900 man-days. 20 men will thus take 900/20 ie 45 days.
1 wall = 5 men X 8 days = 40 man days 40 man days / 3 men = (40/3) days = 13 1/3 days
1 7/8 days Matthew in one day can build 1/3 of the block. Andy in one day can build 1/5 of the block. Together in one day they can build 8/15 of the bolck. It means they need less than 1 day to build 7/15 of the block, which is 7/8 of the day. Thus, they need 1 day and 7/8 of the next day to build the block together.
They will take 4 days to complete the well.
A zoning permit is required to build a fence in Middlesex Boro, New Jersey. Permit usually take about 20 working days to process.
The sum of the outside perimeter of the property.
Six years. Construction on Australia's rabbit proof fence began in 1901 and was completed in 1907. It is not actually a single fence, but a series of fences.
9lkms
Once you’ve decided to put up a fence, you may be ready to have it installed yesterday. Most customers always ask, how long will it take to install my new fence? On average, it takes a few days to install a fence; however, a successful fence installation depends on a few factors.SizeAs you can imagine, a big fence usually takes a long time to install than a small fence. Since professional build or install fences of all sizes, estimated times to build them can vary significantly with the job.ComplexityA more complicated design will take more time to build, however, if you want elegant fences, the extra time will be worth it.WeatherUnfortunately; there is nothing Buzz can do about inclement weather. Sometimes storms force takes a break until conditions are better which can cause a delay in installation.The Bottom Line!Make sure you get installed the fence around your house with the aid of a professional contractor. They are committed to you a durable, aesthetically pleasing fence with minimal interruption to your routine. They make every effort to complete tasks in a timely and professional manner.bytownfence .com
5 days
it take 2 days
20000000000 days
3 days
4oo
four
A square plot of ground measuring 12 acres would encompass approximately 2925 linear feet of fence-line.