HIRE AN ELECTRICAL CONTRACTOR. If you're not an electrician and you're thinking you can put in a 1200 amp service yourself, you can't. If you need to ask how, you shouldn't even be thinking you can. This is a large job which needs to be completed by an electrical contractor. Period.
Chat with our AI personalities
For Service Entrance Cable 600 kcmill (Thousands of circular mils).
Depends on the size of the service. 100 amp service will require 3 gauge, 150 amp service will require 1/0 gauge, and 200 amp service will require 3/0 gauge.
A 200 amp service panel with a 60 amp sub-panel.
Yes, the wire size has to be increased. The existing 100 amp service will now probably have a #3 conductor with an insulation factor of 75 or 90 degrees C which is rated for 100 and 105 amps respectively. Increasing to a 150 amp service will use a #1/0 wire size. If you are thinking of an upgrade, skip the 150 amp service and go to a 200 amp panel. New homes are installing 200 amp 42 circuit panels. The extra cost is only reflected in the materials as the labour costs will be the same regardless whether a 150 amp or a 200 amp panel is installed. The wire size for a 200 amp panel is #3/0. With an insulation factor of 75 or 90 degrees C the rating is 200 or 210 amps respectively.
A 350 amp service is not a standard service distribution. It jumps from a 200 to a 400 amp rated distribution equipment. The only way to obtain a 350 size service is to install 400 amp equipment and fuse it at 350 amps. The standard size home distributions in North America today are rated at 200 amps. The cost of the service differs through out the continent. Ask your local electrical contractor for an estimate on an electrical upgrade to the required service that you want.