# 10 bare copper.
Use #10 copper.
#6 bare copper wire.
The ground wire should go from the dryer directly back to the distribution panel. An external ground wire is not required. The ground wire that is in the cord set that is connected to the frame of the dryer and the ground wire that is in the feeders coming from the distribution panel, that is connected to the ground terminal in the dryer receptacle, is all that is required to satisfy the code requirement.
#6 wire is needed. If placing the subpanel in a garage at a good distance, it is recommended to also install a seperate ground rod .
A typical panel has three large wires entering the main panel from the electric meter and a bare ground wire. Two of the large wires are hot and go to the busses where the breakers are mounted. The third wire is common and is connected to one or more common bus locations. It will usually be silver in color with a screw on top to connect white wires from branch circuits. The ground is the metal of the panel itself and there will be one or more ground busses usually copper colored that are connected to the metal of the panel by screws there by "bonding" these ground busses to the metal of the panel. You should also see a copper wire coming from a ground rod connected to the metal of the panel. At the main panel you need to bond the common to the ground. There is usually a screw that allows this bonding to occur. If you have subpanels ground and common are NOT connected at the subpanels.
The recommended ground wire size for a 100 amp sub panel installation is typically 8 copper wire.
Use #10 copper.
The ground wire should come from the ground rod and to the main electrical panel grounding terminal.
The size of wire needed for a sub panel installation depends on the amperage of the sub panel. It is recommended to consult with a licensed electrician to determine the appropriate wire size for your specific installation.
The size of the ground wire for a circuit is typically based on the size of the circuit breaker protecting that circuit. For a 200 amp circuit breaker, the recommended ground wire size is 4/0 AWG (American Wire Gauge) copper wire. This wire size helps ensure that the ground wire can safely carry any fault currents that may occur in the electrical system.
#6 bare copper wire.
The ground wire should go from the dryer directly back to the distribution panel. An external ground wire is not required. The ground wire that is in the cord set that is connected to the frame of the dryer and the ground wire that is in the feeders coming from the distribution panel, that is connected to the ground terminal in the dryer receptacle, is all that is required to satisfy the code requirement.
In a 200 amp service panel, the ground wire is typically a bare copper wire or green insulated wire. It is connected to the ground bar within the panel. Make sure to consult the manufacturer's instructions or a licensed electrician for guidance specific to your installation.
The bare wire from the old 3-wire stove should be connected to the grounding terminal in the panel. The neutral and ground should not be bonded together at the stove. If the stove requires a 4-wire connection, it's best to run a new 4-wire circuit to meet current electrical codes for safety.
#6 wire is needed. If placing the subpanel in a garage at a good distance, it is recommended to also install a seperate ground rod .
The recommended ground wire size according to the NEC Ground Wire Size Chart is based on the amperage of the circuit.
#8 would be fine if you ground each panel separately to the ground rod