You have a flat area of 15 feet times 15 feet = 225 square feet. You want to convert this to a volume of cubic yards? Impossible.
To convert square feet to square yards, you need to divide by 9 because there are 9 square feet in 1 square yard. In this case, 15 x 15 feet is 225 square feet. Dividing 225 by 9 gives you 25 square yards. So, 15 x 15 feet is equivalent to 25 square yards.
15' x 15' (225 square feet) = 25 square yards.
45 x 66 = 2970 ft2 15 yards = 45 feet 22 yards = 66 feet
22.5
15' x 17' (255 square feet) = 28.3 square yards.
12*15*.33333= 60 cubic feet. 60 cubic feet/27 cubic feet per cubic yard = 2.222 cubic yards
If you have to dig a hole 270 feet wide by 470 feet long to a depth of 15 feet, you've got a lot of digging to do. The volume is a simple product, so 270 x 470 x 15 = 1,903,500 cubic feet. Since there are 27 cubic feet to the cubic yard, you've got 70,500 cubic yards of dirt to move! If your trucks carry 12 yards, that's 5,875 loads. That's a lotta fill!,
To convert the dimensions to yards, we first convert inches to yards by dividing by 36 (since 1 yard = 36 inches). Then we multiply the dimensions to get the volume in cubic yards. 25 feet = 25 feet 13 feet = 13 feet 4 inches = 4/36 yards = 1/9 yards Volume = 25 * 13 * 1/9 = 36.111 cubic yards (rounded to 3 decimal places).
Multiply (acre-feet) by (1,613 and 1/3) to get (cubic yards). 3 acre-feet = 4,840 cubic yards. Multiply (cubic yards) by (0.00062) to get (acre-feet). 24,200 cubic yards = 15 acre-feet
To convert feet to yards, you need to know that 1 yard is equal to 3 feet. To convert 15 feet to yards, you would divide 15 by 3, which equals 5 yards. Therefore, 15 feet is equivalent to 5 yards.
110 cubic yards (rounded)
for a concrete order, I would calculate the cubic footage first: 15 X 31 X 0.33 (4 inches) =153.45 cubic feet. there are 27 cubic feet in one cubic yard, so 154 (round up in construction--believe me..) again 154 divide by 27 is a concrete order of 5.703 cubic yards. cheers mate!
3 Beds x 5' x 15' x 9" = convert all measurements to yards: 3 Beds x (5/3) yards x (15/3) yards x (9/36) yards= 3 Beds x 1.6667 yards x 5 yards x .25 yards = 6.25 cubic yards.
1 yard = 3 feet. Thus, to convert from yards to feet, you multiply by 3.
To calculate the amount of crushed stone needed for a shed base measuring 11 feet by 15 feet and 4 inches deep, first convert the depth to feet: 4 inches is approximately 0.33 feet. Then, calculate the volume: 11 ft x 15 ft x 0.33 ft = 54.45 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27 to find the total in cubic yards: 54.45 / 27 ≈ 2 cubic yards. Therefore, you will need about 2 cubic yards of crushed stone.
It is: 15/3*20/3*8/3 = 88.89 cubic yards rounded to two decimal places
To calculate the amount of concrete needed for a 12 x 15 slab, first find the area in square feet: 12 x 15 = 180 square feet. Then, convert square feet to cubic yards by multiplying the area by the desired thickness (in feet) and then dividing by 27 (since there are 27 cubic feet in a cubic yard). For a standard 4-inch thick slab, the calculation would be 180 x (4/12) / 27, resulting in approximately 2.67 cubic yards of concrete needed.