For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.
To my knowledge, concrete is measured in cubic yards. you would convert your measurements to yards 2000 sq ft is about 222.22 sq yards 4 inches is about 0.11 yards multiply to get volume, about 24.7 cu yards
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.
how may yards of concrete are needed for a floor 24 x 25 feet?
To convert square inches to square yards, divide square inches by 1,296.
40.1 cubic yards
For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.
To my knowledge, concrete is measured in cubic yards. you would convert your measurements to yards 2000 sq ft is about 222.22 sq yards 4 inches is about 0.11 yards multiply to get volume, about 24.7 cu yards
8 square yards
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.
how may yards of concrete are needed for a floor 24 x 25 feet?
39.1116 cubic yards
One square yard is nine square feet, so 27 square feet is equivalent to 3 square yards. So 3 yards of concrete will cover 27 square feet.
How thick? Gotta have thickness to calculate cubic yards.
123.44 cubic yards
At a poured depth of 4 inches, you will need 4.94 cubic yards.
Allow 5.5 to 6 yards. Always allow for wastage, underrunning forms, etc.