Apples and oranges. Without knowing how thick the 450 sq. ft. area is or how thick you want it to be you can't convert to cubic yards. A cubic yard has 27 cubic feet. One square foot 3 inches thick would be 1/4 cubic feet. 4 sq. ft. 3 inches thick would be 1 cubic foot. 450 sq. ft. 3 inches thick is 112 1/2 cubic feet or just a bit over 4 cubic yards. 450 sq. ft. 4 inches thick is 150 cubic feet or 5 1/2 cubic yards.
I think you mean 6 inches thick, not 6 feet thick. You would need 200 cubic feet, or 7.4 cubic yards.
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.
137.5 cubic feet or 5.09 cubic yards.
If it is 4 inches deep/thick, 2 cubic yards. If it is 6 inches deep/thick, 3 cubic yards.
Apples and oranges. Without knowing how thick the 450 sq. ft. area is or how thick you want it to be you can't convert to cubic yards. A cubic yard has 27 cubic feet. One square foot 3 inches thick would be 1/4 cubic feet. 4 sq. ft. 3 inches thick would be 1 cubic foot. 450 sq. ft. 3 inches thick is 112 1/2 cubic feet or just a bit over 4 cubic yards. 450 sq. ft. 4 inches thick is 150 cubic feet or 5 1/2 cubic yards.
39.1116 cubic yards
I think you mean 6 inches thick, not 6 feet thick. You would need 200 cubic feet, or 7.4 cubic yards.
There are 9 square yards in a cubic yard at a thickness of 3 inches. This is because there are 9 square feet in a square yard and 36 cubic feet in a cubic yard, so the area is 9 square yards if the thickness is 3 inches.
To convert square feet to cubic yards, you need to multiply by the height. Since the height is given in inches, you first need to convert it to feet (4 inches = 0.33 feet). Then, you can calculate: 460 sq ft * 0.33 ft = 151.8 cubic feet. Finally, you can convert cubic feet to cubic yards (1 cubic yard = 27 cubic feet), so 151.8 cubic feet / 27 = 5.62 cubic yards in 460 square feet at 4 inches thick.
27 cubic feet = 1 cubic yard4 inches = 1/3 footVolume = 2,400 x 1/3 = 800 cubic feet = 29.63cubic yards
Based on the category I am assuming we are takling dirt or mulch. 75 yds x 27 cuft (there is 27 cuft per 1 cuyd) = 2,025 cubic feet of material - 1 foot thick would be 2,025 sqft. - 6 inches thick would be 4,050 sqft. - 3 inches thick would be 8,100 sqft.
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.
22.2222 cubic yards (the 2s keep on going).
151/9 cubic yards for every 12 inches thick