This would be 4 yds of concrete. 108 x 1 = 108 cu ft. 3 x 3 x 3 = 27 cu ft /cu yard. 108 / 27 = 4 cu yards of concrete (or anything else).
123.44 cubic yards
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
1.85 cubic yards.
92.593 cubic yards for every inch deep.
By yards I assume you mean cubic yards. Next: How deep: I assume 3 inches. (969 x 122 /3 ) / 123 = 969 / 36 = 323/12 = 26.9166666 cubic yards
40.1 cubic yards
280 / 9 square yards x 2 / 36 yards = 1.7284 cubic yards (about 1 3/4 cu yds)
How thick? Gotta have thickness to calculate cubic yards.
123.44 cubic yards
For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.
multiply the number of square yards - which is an area - by the average height in yards to get the volume in cubic yards
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
For a 4-inch depth you will need 7.41 cubic yards.
0.6 cubic feet in one 80 lb bag. with there being 27 cubic feet in one cubic yard: 0.02 cubic yards per bag, in other words, it would take 45 - 80lb bags to yeild 1 cubic yard of concrete
The term "yards" of concrete means cubic yards.
That makes no sense. -Square yards is AREA. -Cubic yards is VOLUME . They are totally different. (However, 3 yards cubed, i.e. 3 yards x 3 yards x 3 yards = 27 CUBIC yards)
240 cubic feet = about 8.9 cubic yards. (8.88888889 cubic yards).