30 weeks x 7 (days in a week) = 210 days.
215 days is equivalent to 30 weeks and 5 days.
one month (30 days) is having = 4 weeks 1 day is having = 4/30 weeks 147 days are having = 4/30*147 = 19 weeks
About 30 weeks. A month is not a fixed number of days, but averages 30.4 days. So 7 months is 213 days, or 30 weeks and three days.
30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.
30 weeks x 7 (days in a week) = 210 days.
30 days
215 days is equivalent to 30 weeks and 5 days.
There are 30 working days in six weeks.
one month (30 days) is having = 4 weeks 1 day is having = 4/30 weeks 147 days are having = 4/30*147 = 19 weeks
60 weeks and 6 days.
About 30 weeks. A month is not a fixed number of days, but averages 30.4 days. So 7 months is 213 days, or 30 weeks and three days.
30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.
There are 30/24 = 1.25 days
30.
About 6 weeks and 2 days.
7 days = 1 week Sept + Oct + Nov = 30 days + 31 days + 30 days = 91 days = 91 ÷ 7 weeks = 13 weeks