11.852 cubic yards
At a poured depth of 4 inches, you will need 4.94 cubic yards.
If the slab is the standard 4" deep, you will need at least 8.89 cubic yards.
16 * 20 = 320 sq ft. at 4" thick concrete will cover 80 sq ft. 320 / 80 = 4 yards.
16 ft * 47 ft * 4 inches =16/3 yards * 47/3 yards * 4/36 yards = 9.3 yards approx.