you will need about 4 cuyds for your project.
131,328 in3, but you should have worked it out for yourself.
(60 x 1.5 x 13/12) / 27 = 3.61 cubic yards
1.54321 cubic yards See the related link below
You will need about 0.8 cubic yards - 1 cubic yard is a safe bet.
87.5 cubic feet
131,328 in3, but you should have worked it out for yourself.
128
0.246914 cu. yards (6.666667 cu. ft ) of concrete is needed.
you would need 37.33 yards of concrete or 38 to be safe
(60 x 1.5 x 13/12) / 27 = 3.61 cubic yards
Less than 1/2 yard pre-mix.
1.54321 cubic yards See the related link below
You will need about 0.8 cubic yards - 1 cubic yard is a safe bet.
87.5 cubic feet
It typically takes about 24 to 48 hours for 6 inches of concrete to cure completely.
A standard concrete block in the US is 16 inches long, 8 inches tall, and 4 inches wide.
147 cubic feet of cement are required.