answersLogoWhite

0

What else can I help you with?

Continue Learning about Math & Arithmetic

What is 16.79 plus tax?

To calculate the total amount including tax, you need to know the tax rate. For example, if the tax rate is 7%, you would multiply 16.79 by 0.07 to find the tax amount, which is approximately 1.17. Adding this to the original amount, 16.79 plus 1.17 equals about 17.96. Adjust the tax rate as needed for different totals.


How is algebra used in mixing drinks?

Algebra can be used in mixing drinks to calculate the amount of each ingredient needed to make a certain quantity of the drink. For example, if a recipe calls for a certain ratio of ingredients, algebra can be used to calculate the exact measurements needed based on the desired final volume of the drink. Algebra can also be helpful in scaling up or down a recipe to accommodate different serving sizes.


Which of these is needed to be able to calculate the frequency?

period


Does the power needed to raise a box onto a platform depend on how fast it is raised?

Technically, once you know the weight of the box and the height of the platform, you can state the amount of"work" or "energy" needed to raise the box onto the platform. But there's no such thing as the power "needed"to do the job.Power is just the rate of doing work. You can calculate the amount of work needed, but it doesn't matter whetherthe work is done slowly or fast ... with low or high power.


How much plaster is needed to cover a square meter?

The amount of plaster needed to cover a square meter typically depends on the thickness of the application. Generally, for a standard layer of plaster, you would require about 1.5 to 2 kilograms of plaster per square meter for a thickness of around 10 mm. However, this can vary based on the type of plaster and the surface being covered, so it's always best to consult manufacturer guidelines for specific products.

Related Questions

How do you calculate the yards of concrete needed for 3570 square feet?

How thick? Gotta have thickness to calculate cubic yards.


How do you calculate the amount of plasterboard needed?

Calculate the area to be covered. (A) Calculate the area per board or pack (B) Divide (B) into (A)


How do you calculate the weight of coating?

To calculate the weight of coating, you need to know the area to be coated, the density of the coating material, and the desired thickness of the coating. The formula commonly used is: Weight = Area x Density x Thickness. Multiply the area by the density of the coating material and the desired thickness to determine the weight of the coating needed.


How much mortar do I need for my upcoming project?

To determine how much mortar you need for your project, calculate the area to be covered and the thickness of the mortar layer. Multiply the area by the thickness to find the volume of mortar needed.


What amount of force is needed to bend tube mital?

It depends on the thickness of the tube, the diameter of the tube and the shear strength of the material.


What information is needed to calculate the amount of energy needed to heat of volume of water to some temperature?

You need the amount of water, the temperature of the water, and the desired temperature.


What two values are needed to calculate the concentration of a chemical in an organism?

Solubility and amount of the substance


How many yards of concrete in 900 sf?

To calculate the amount of concrete needed for a 900 square foot area, you first need to determine the thickness of the concrete slab. Once you have the thickness in inches, divide it by 36 to convert to yards. Then divide the total cubic yards by the number of cubic yards in a concrete truck to determine how many truckloads you need.


How do you calculate brick quantity for brickbats waterproofing?

Well, darling, to calculate the quantity of bricks needed for brickbat waterproofing, you first measure the surface area to be covered. Then, you determine the size of the bricks and the thickness of the brickbat layer. Divide the surface area by the product of brick size and thickness to get the quantity of bricks required. It's as simple as that, honey!


How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


What is mass flow?

A "mass airflow" sensor, measures the amount of air entering an engine to properly calculate the amount of fuel that is needed.


How do you calculate Concrete volume on corrugated metal decking?

You need several quantities to calculate concrete volume for corrugated metal decking. You need both the flute height in inches, flute width in inches, flute foot in inches, sealant depth or thickness in inches, gap size in inches, and deck length in feet.