It depends on the volume of the bag and how deep you want the gravel to be.
You will need 20 cubic yards or 25.7 tons of gravel.
Plan on about 2.2 cubic yards (2.8 tons) of gravel.
92.593 cubic yards for every inch deep.
(2222/9) times (the weight of 1 cubic yard of gravel, in tons)
algorythm
To calculate the volume of gravel needed, first convert all measurements to the same unit. Then, use the formula: Volume = width (ft) x length (ft) x depth (ft). In this case, you would calculate: 0.75 ft x 250 ft x (14/12) ft = 218.75 cubic feet of gravel needed for the driveway.
Yes, to calculate the amount of gravel needed for a slab, you can use the formula: Volume = Length × Width × Depth. First, measure the dimensions of the area where the slab will be placed, then convert these measurements into the same unit (e.g., feet or meters). Multiply these dimensions to get the volume in cubic feet or cubic meters. Finally, since gravel is typically sold by the cubic yard, convert the volume from cubic feet or meters to cubic yards by dividing by 27 (for cubic feet) or 1.31 (for cubic meters).
The Excel credit card payoff formula is PMT(rate, nper, -balance). This formula calculates the monthly payment needed to pay off a credit card debt within a specific time frame.
It depends on the volume of the bag and how deep you want the gravel to be.
An example of an inclined plane physics problem is calculating the force required to push a box up a ramp. To solve this problem, you would need to use the formula for calculating the force of gravity acting on the box, as well as the formula for calculating the force required to overcome the incline of the ramp. By applying these formulas and considering the angle of the ramp, you can determine the force needed to push the box up the incline.
The most effective Excel formula for calculating credit card payoff is the PMT function. This function helps you determine the fixed monthly payment needed to pay off a credit card balance within a specific timeframe, taking into account the interest rate and other relevant factors.
The sub-grade's compacted soil, topped by the sub-base of crushed stone and then the pea gravel.
You will need 20 cubic yards or 25.7 tons of gravel.
You will need 65.93 cubic yards or 84.6 tons of gravel.
To make Dromana gravel firm, you can use a vibratory plate compactor to compact the gravel layers. Start by spreading the gravel evenly and in thin layers, then run the compactor over each layer multiple times to achieve proper compaction. Make sure to add moisture to the gravel if needed, as damp gravel compacts better than dry gravel.
Plan on about 2.2 cubic yards (2.8 tons) of gravel.