dolphins cant swim
Chat with our AI personalities
1 brink = (¾+¼) brick = ¾ brick + ¼ brick If 1 brick balances ¾ brick + ¾ lb then: 1 brick = ¾ brick + ¼ brick = ¾ brick + ¾ lb → ¼ brick = ¾ lb (subtracting ¾ brick from both sides) → 1 brick = 3 lb (multiplying both sides by 4).
I think that'd be 8 hours. 6/3 = 2 hours/worker. One less worker, 2 more hours._____________________________________________________________________nine hoursEach bricklayer can complete 1/3 of the wall in 6 hours.Two brick layers can complete 2/3 of a wall in 6 hours (2 x 1/3).To complete the other 1/3 of the wall, the two brick layers would need another 3 hours.
Math (or maths) is not a job and so engineering does not use math as a job!Math (or maths) is not a job and so engineering does not use math as a job!Math (or maths) is not a job and so engineering does not use math as a job!Math (or maths) is not a job and so engineering does not use math as a job!
Everyone uses math every day. Architects use math to make sure that their building designs are stable. Teachers use math to count the number of students in the class. Salesmen use math to figure out their profits.
math manic