2
1 at a minimum.
15 blocks. The same steps can be used for going up or down!
To determine how many men are needed to build a house in 15 days, we can use the formula: (Men1 * Days1) / Days2 = Men2. So, (20 men * 60 days) / 15 days = 80 men. Therefore, 80 men would be needed to build the house in 15 days.
To determine how many times 50 goes into 2500, you would divide 2500 by 50. The result of this division is 50, meaning that 50 goes into 2500 50 times. This is because 50 multiplied by 50 equals 2500.
2
2500
1,000
They used 2.3 million blocks of stone
masonry work
That depends on local zoning laws and how large you want your house to be. Once acre is equal to 43560 square feet, and the average home is no more than 2500 square feet I'm guessing (excluding basements and stories). Technically you could build a house on .1 acres if you wanted.
The question is... how big are the blocks?
The number of blocks needed to build a 3-bedroom self-contained house can vary depending on the size of the rooms, the design of the house, and the thickness of the walls. On average, a 3-bedroom self-contained house may require anywhere from 10,000 to 15,000 blocks. It's essential to consult with a structural engineer or architect to determine the exact quantity needed based on the specific plans and requirements of the construction project.
21,700,001
The answer depends on how big the blocks are! The answer depends on how big the blocks are! The answer depends on how big the blocks are! The answer depends on how big the blocks are!
Thee are 2.3 million limestone blocks used to build the praymid Kufu. There are 1.3 million blocks are used to build the praymid Khafre.
150