To determine how many men are needed to build a house in 15 days, we can use the formula: (Men1 * Days1) / Days2 = Men2. So, (20 men * 60 days) / 15 days = 80 men. Therefore, 80 men would be needed to build the house in 15 days.

User Avatar

ProfBot

6mo ago

What else can I help you with?

Related Questions

If 25 men can build a house for 18 days how many days can 15 men built?

Well, buckle up, buttercup. If 25 men can build a house in 18 days, that means it takes 25*18 = 450 man-days to build the house. Now, if you throw 15 men into the mix, you just need to divide those 450 man-days by 15 to find out how many days it will take them. So, 450 man-days divided by 15 men equals 30 days for those fellas to build that house.


12 men can build 5 houses in 75 days how long will 20 men take to build 7 such houses?

75 / 5 = 15 days for 12 men to build one house. 15x12 = 180 days for 1 man to build 1 house. 180 x 7 = 1260 days for 1 man to build 7 houses. 1260 / 20 = 61 days for 20 men to build 7 houses.


If it takes 50 men to build a house in 7 days how long would it take 10 men to built that?

35 days


If 5 men can build a wall in 8 days how many days will 3 men take to build the same wall?

1 wall = 5 men X 8 days = 40 man days 40 man days / 3 men = (40/3) days = 13 1/3 days


If 2 men build a wall in 6 days how long does it take 3 men to build a wall at the same rate?

4 days


18 men can build in 12 days how many men must be employed to build a similar wall in 9 days?

Suppose, the dimension of wall built by one man per day equals to W, and everyone has the same workload. Then, the dimension of wall built by 18 men in 12 days can be calculated as, 18*12*W=216W. We assume the number of men employed to build a similar wall in 9 days is M. So, 9MW=216W, rearrange the equation, we get M=24.


A contractor has to build a bridge in 50 days Initially he employed 20 men but found that only half of the work has been completed in 30 days How many more men he has to employ to finish the Jo?

10


12 men can build 5 houses in 75 days how long will 20 men take to build such houses?

Building 5 houses takes 12 x 75 ie 900 man-days. 20 men will thus take 900/20 ie 45 days.


If 5 man build 2 houses in 1 day. How many man will built 2 houses in 2 days?

2.5 men.


If 5 men took 20 days to build a fence how much days will 3 men take and 8 men take?

It takes 100 man-days, so three men would take 33 and a third days and 8 men 12½ days. Working together the 3 men and 8 men would take 100/11 or 9 and a ninth days


How many men did it take to build the step pyramid?

it took a couple thousand men to build the step pyramid.


How many men did it take to build castles?

14,000,000,000 men at the least.