This questions needs a lot more detail, but generally if you have two values to put on a graph the first one is placed on the x axis and the second is placed on the y axis. For example, you have values like (22,50) then you would look at them like (x,y)....If you are solving many problems and there are only two final values, then this way of plotting them is okay.
The x axis is horizontal, the y axis is vertical and there is a z axis that is diagonal.
There are positive and negative sides of all three axes. Hope this helps.
or
The dependent variable
.... then your graph is inverted.
In statistics, a graph and a chart are the same. In arithmetic, a graph is the plot of a function over values. There are no charts.
It is usual to plot the values of the dependent variable on the y-axis. That is what you measure when you change something else, the independent variable.
A graph and stem is different to a leaf plot because in a leaf plot, there is a stem and leaf in a plot, while in a graph and stem, there is a leaf and stem in a graph.
A scatter graph, also known as a coordinate graph, a coordinate plot, or a scatter plot, is a graph with coordinates.
A line graph is a line plotted on a 4 quadrant graph. A line plot is a graph that plots values on a graph !
.... then your graph is inverted.
In statistics, a graph and a chart are the same. In arithmetic, a graph is the plot of a function over values. There are no charts.
It is usual to plot the values of the dependent variable on the y-axis. That is what you measure when you change something else, the independent variable.
It's like a stem and leaf plot, but instead of stem and leaf, use X and Y values.
use microsoft office excel ..!! tabulate the date and select the type of graph u want to plot :)
On a line graph, the points are connected by a line. Hence the name 'line graph". A line plot is, A line plot can be used as an initial record of discrete data values. The range determines a number line which is then plotted with X's for each data value.
To create an acceleration-time graph from a velocity-time graph, you need to find the slope of the velocity-time graph at each point. The slope represents the acceleration at that specific instant. Plot these acceleration values against time to get the acceleration-time graph.
Just like you graph about any function: Pick some values for x, calculate the corresponding values for y, plot the points, join in a smooth curve.
A graph and stem is different to a leaf plot because in a leaf plot, there is a stem and leaf in a plot, while in a graph and stem, there is a leaf and stem in a graph.
A scatter graph, also known as a coordinate graph, a coordinate plot, or a scatter plot, is a graph with coordinates.
Make a table: for some different values of x, calculate the value of the function. Plot the points on a graph, and join them by lines.