A yard is 3ft. So 5 yards and 2ft - 4ft is 4 yards and 1 ft or 17 ft - 4ft is 13ft.
3x5x4 = 60 cubic feet
Not without having to slice some tiles up ! The tiles you would need are:- 2 of 3ft x 3 ft 1 of 2ft x 3ft 2 of 3ft x 1 ft 1 of 2ft x 1 ft
A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
(32yds and 2ft) + (4yds and 2ft) = 36yds and 4ft. Since 1yd is 3ft, we can express the answer as 37yds and 1ft.
5ft * 4ft * 3ft = 60 cubic ft = 1.699 cu metres
A yard is 3ft. So 5 yards and 2ft - 4ft is 4 yards and 1 ft or 17 ft - 4ft is 13ft.
3x5x4 = 60 cubic feet
Not without having to slice some tiles up ! The tiles you would need are:- 2 of 3ft x 3 ft 1 of 2ft x 3ft 2 of 3ft x 1 ft 1 of 2ft x 1 ft
A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
(32yds and 2ft) + (4yds and 2ft) = 36yds and 4ft. Since 1yd is 3ft, we can express the answer as 37yds and 1ft.
10' x 12' = 120ft² 1yd² = 3ft x 3ft = 9ft² 120ft² / 9 ft² = 13.33yd²
6
25.4 yd^2 * 3ft^2/1yd^2 * 3ft^2/1yd^2 = 228.6 ft^2
3ft = 36 inches 4 ft = 48 inches. Hence 3ft x 4ft = 12 sq.ft. It follows that 36 ins x 48 ins = 1728 sq.ins.
There are 3ft in a yard so: 25ft/3ft = 8yards and 1 ft =] -ray
No. 1 yard = 3 ft So if you have 3 yards that is 3ft + 3ft + 3ft or 3+ 3 + 3 = 12ft