12ft2
A yard is 3ft. So 5 yards and 2ft - 4ft is 4 yards and 1 ft or 17 ft - 4ft is 13ft.
Not without having to slice some tiles up ! The tiles you would need are:- 2 of 3ft x 3 ft 1 of 2ft x 3ft 2 of 3ft x 1 ft 1 of 2ft x 1 ft
Volume: 3*15*2 = 90 cubic ft
3ft x 5ft x 6ft =90
5ft * 4ft * 3ft = 60 cubic ft = 1.699 cu metres
12ft2
A yard is 3ft. So 5 yards and 2ft - 4ft is 4 yards and 1 ft or 17 ft - 4ft is 13ft.
Not without having to slice some tiles up ! The tiles you would need are:- 2 of 3ft x 3 ft 1 of 2ft x 3ft 2 of 3ft x 1 ft 1 of 2ft x 1 ft
LxWxH it is 28ft2
Volume: 3*15*2 = 90 cubic ft
7.0686 cubic feet.
3ft x 5ft x 6ft =90
1 ft x 1 ft x 1 ft = 1 cubic ft (volume)4ft x 6ft = 24 sq ft ( area )therefore divide the required volume by the stated area to get the 3rd dimension - the height72/24 = 3ft
A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
(32yds and 2ft) + (4yds and 2ft) = 36yds and 4ft. Since 1yd is 3ft, we can express the answer as 37yds and 1ft.
Volume = 2*3*5 = 30 cubic feet