This question cannot be answered sensibly. A square foot is a measure of area, with dimensions [L2]. A cubic yard is a measure of volume, with dimensions [L3]. Basic dimensional analysis teaches that you cannot convert between measures with different dimensions such as these without additional information.
To calculate the volume of dirt needed to fill the area, you would need to know the depth of the area in yards. If the depth is 3 yards, then you would need 1800 yards of dirt (600 cubic yards รท 3 yards). If the depth is 1 yard, then you would need 600 yards of dirt.
600 square feet of 4 inch thick concrete is equivalent to 6.67 cubic yards. This can be calculated by first converting the square feet to cubic feet (600 sq ft x 4 inches = 200 cubic feet), and then converting cubic feet to cubic yards (200 cubic feet รท 27 = 6.67 cubic yards).
There are 548.64 meters in 600 yards.There are 0.9144 metres in one yard. Therefore, 600 yards is equal to 600 x 0.9144 = 548.64 metres.
600 cubic meters equates to 158,503 US gallons.
3 feet = 1 yard so: 200 feet divided by 3 = 66.66667 yards
600 US gallons = 138,600 cubic inches = 80.208333... cubic feet = 2.9707 cubic yards. (rounded)
To calculate the volume of dirt needed to fill the area, you would need to know the depth of the area in yards. If the depth is 3 yards, then you would need 1800 yards of dirt (600 cubic yards รท 3 yards). If the depth is 1 yard, then you would need 600 yards of dirt.
For a 4-inch depth you will need 7.41 cubic yards.
600 feet is 200 yards.
200 yards
600 square feet of 4 inch thick concrete is equivalent to 6.67 cubic yards. This can be calculated by first converting the square feet to cubic feet (600 sq ft x 4 inches = 200 cubic feet), and then converting cubic feet to cubic yards (200 cubic feet รท 27 = 6.67 cubic yards).
1,800 feet (600 Yards x 3 feet/yard)
There are 3 feet in one yard. Therefore, 600 feet is equal to 600/3 = 200 yards.200 yards.
There are 548.64 meters in 600 yards.There are 0.9144 metres in one yard. Therefore, 600 yards is equal to 600 x 0.9144 = 548.64 metres.
it is 600/1760=.340909090909................................
25 yards is 22.86m. 600/22.86 is 26.25 times
You will need 0.309 cubic yards (about 600 pounds) of gravel.