28 weeks is approximately 6-7 months, as each month has around 4 weeks.
About 14 months and a week.
16 weeks is approximately 3.7 months.
2 and 1/2 months.
There are approximately 146 weeks in 34 months.
108 days is 108/7 weeks. 4 and 2/3 weeks is considered a work month. Therefore it works out to (108/7) / (14/3) = (108 x 3) / (7 x 14) = 324/98 = 3.306 months
what doubt it is?108 weeks!!!
3 months
3 months
about 4.6 months
18 months
9 months
28 weeks is approximately 6-7 months, as each month has around 4 weeks.
469 days 16 months & 3 weeks
About 14 months and a week.
16 weeks is approximately 3.7 months.
Months are generally 30 or 31 days long with 7 days in a week. That makes each month a little over 4 weeks long. 39 weeks would be almost 10 months or 9 months and 3 weeks.